PAVING THE MAIN ROAD FROM (QAYYARAH – SHIRQAT) TO AHMED HASSAN METRAS MOSQUE, NINEVEH GOVERNORATE

Project location :Ninewa Governorate

Client :Rural Development Department - Ninewa Governorate

Contract Value (US$) :(US$): 135,960.00

Contract Duration: 4 Months

Contract Start Date:2020-02-05

Contract Completion2020-03-01

Scope of work:

AL KHATAB AL MUTAHIDA Co. had been contracted with (Rural Development Department - Nineveh Governorate) to paving the main road from (Qayyarah – Shirqat) to Ahmed Hassan Metras Mosque, Nineveh Governorate according to BoQ & Iraq's standard Specifications for road and bridges.

The contract contains the following activities:

1- Removing all the damaged asphalt layers, all rubble and debris to a dump site approved by the local authorities.

2- Supply of materials, tools, machineries and manpower for the work of cutting and burial with clean soil by layers with spreading and compacting and providing special levels for drainage with lateral slope (2-6%).

3- Supply of materials, tools, machineries and manpower for paving by (Stabilizer coarse) thickness (10 cm) With spraying (Prime coat) at 1.25 l / m2, using crushed gravel within the mixture.

4- Supplying, spreading and compacting sub-base thickness (20 cm) with spreading and compaction not less than (95%) with lateral slope (2-6%).

5- Fixing the shoulders of the road by using (Sub-base Type B) thickness (10 cm) with a width of (1.5 m) for each side of the road.

All requirements according to Iraqi roads and highways technical specifications

Photos

Projects
Send us a message

Our Contacts

Address

AI-Zwyia-Baiji, Salahuddin - Iraq 126 English Village, Erbil - Iraq

Al-Mutanaby
neighborhood - Baghdad - Iraq

Al-Baradya zone - Basra - Iraq


Email

info@alkhatabco.com 

alkhatab.almutahida@gmail.com


Mobile

009647708506005

009647517106759

009647834140505