Implementation of the project works of the alternative station / Al-Dujail water in the Baghdad Governorate.
Project location :Baghdad Governorate / Iraq
Client :Al-FAO General Engineering Company
Contract Value (US$) :(US$): 0
Contract Duration: 90 Days
Contract Start Date:2024-09-10
Contract Completion2024-12-19
Contract Completion Date:
Scope of Work: Al Khattab United Company has been contracted to implement the works of supplying, drilling and burying a (100 mm) pipe for the alternative station project / Al-Dujail water located in Baghdad - Governorate, according to the contract requirements and the bill of quantities. This work is an important part of improving the city’s infrastructure and providing better water access to the beneficiary areas.
The contract includes the following activities:
1.Preparing the site, determining the path for the pipeline by using the total station device, and removing all obstacles and waste.
- Excavation of all sections of the site in soft and hard soil (from 0 to 2.5 meters deep) throughout the site, taking into account the use of hydraulic excavators, supporting them as needed, and transporting excavated materials to a stockpile within 15 km.
- Supply and installation of PVC connection pipes, PN 12.5 Bar, Size 100mm, Thickness 13.4 mm, with socket and rubber ring, effective length (with external socket) = 6 m (15 km)
- Supply and installation of a 45° PVC elbow with a 32-inch diameter, compatible with a 100 mm pipeline.
- Construction of box culverts in the shape of (U) with a sliding roof with dimensions of (2.5*2.5*8) meters.
Environmental and Safety Considerations: Environmental and Safety Considerations: The project will comply with local and international safety regulations, ensuring the safety of workers and minimizing environmental impact through the use of eco-friendly materials and energy-efficient solutions where possible. The measures include providing necessary safety training, adhering to waste disposal protocols, and using low-emission vehicles.