Baiji, North Refinery Rehabilitation & Reconstruction Project Phase 1
Project location :NORTH REFINERIES IRAQ.شركة مصافي الشمال
Client :CALIK ENERJI SAN.TIC A.S. IRAQ BRANCH
Contract Value (US$) :(US$): 0
Contract Duration: 60 Days
Contract Start Date:2025-11-15
Contract Completion2026-01-15
Scope of work: -
AL KHATAB AL MUTAHIDA Co. has been contracted by CALIK ENERJI SAN. TIC A.S. – Iraq Branch to execute a comprehensive scope of logistics, dismantling, and transportation works within Iraq.
The project was successfully implemented in full compliance with technical, safety, and operational standards, covering the following activities:
Scope of Work
- Dismantling, Lifting, and Loading Works
Execution of dismantling, lifting, loading, and organized handling of all company-owned equipment located inside Baiji Refinery, including the provision of qualified manpower, heavy machinery, lifting equipment, and all related handling and logistics services.
- Transportation, Unloading, and Installation
Transportation of materials and equipment from Baiji to Erbil (Al-Kuwair Area), including secure logistics operations, unloading at the destination site, and final installation in accordance with approved technical procedures.
The project reflects AL KHATAB AL MUTAHIDA Co.’s strong capabilities in industrial logistics, heavy equipment handling, dismantling works, transportation, and on-site installation, supported by experienced technical teams and a modern fleet of machinery.